Commercial Electrical Contracting Projects

Lambeau Field, Green Bay, WI
NEI was proud to be one of the local firms building the landmark, new Lambeau Field. The project was on a Fast-track

Chip-In Island Resort & Casino, Harris, MI
Chip-In Island Resort & Casino recently underwent an expansion to bring the glitz and glamour of Las Vegas to the Upper Peninsula. NEI is proud to have been a part of it from the gaming floor and boat-bar lighting to the installation of the new electrical service and parking lot improvements.

Celebration Church, Green Bay, WI
NEI worked directly with the architect on the design of the electrical system which included a theatrical lighting and dimming system in this 5,000 square foot addition.

Community Memorial Hospital, Oconto Falls, WI
All work was executed while the hospital was functioning, so NEI paid special attention to maintaining a sterile environment. We worked with the owner, engineer and general contractor to minimize dust and noise contamination and prevented airborne contamination from escaping into the hospital HVAC systems. NEI installed special systems for emergency back-up power. Our team was very proud to donate
equipment to fund construction of the Helipad.

Weidner Center for the Performing Arts, Green Bay, WI
The Weidner Center provided a unique challenge in that we had to intergrate and new electrical system with an existing one. This fast-track system included theatrical lighting and dimming systems.

Wrightstown High School, Wrightstown, WI
A much-anticipated new construction project for a growing school district where NEI provided primary electrical work for a 175,000 sq. ft. project and managed ten subcontractors.

Resch Aquatic Center, Green Bay, WI
The Resch Aquatic Center starts with a zero depth area and tot sand play area for the smallest swimmers and features two 30' high waterslides,a one-meter diving board, a drop slide and the whirl cove area for the more adventurous swimmers. Conveniences include coin operated lockers, full service concessions, two unisex changing rooms, off-street parking and lounge chairs.

DNR Regional Headquarters, Howard WI
This building was a LEED (Leadership in Energy and Environmental Design) project and it was registered by the architect as a LEED 4.0 Registered Project by the U.S. Green Building Council. NEI worked directly with the general contractor to perform value engineering to meet budget and design requirements. The project incorporated multiple systems such as paging, communication, theatrical, cameras, TV and power distribution. NEI also furnished and installed the low voltage lighting system.