Industrial Electrical Contracting Projects

Neenh water treatment

Neenah Water Treatment Plant

This project is part of a 20 million dollar expansion to the Neenah Water Treatment Facility. The term of the project was two years and consisted of a significant expansion and renovation of the existing facility. NEI's task was to install a new 4000 amp electrical service backed up by a 1250 KW generator and back feed the existing service without shutting the facility down. During the process it took careful coordination between NEI's project managers the owner and the general contractor as well subcontractors to do what needed to be done and keep the facility on line the whole time. NEI's ability to competitively estimate a project of this nature and have the skill level in the field to do the job.

 

GB water treatment

City Water Treatment Plant, Green Bay, WI

The project was an ozone generating project fo rhte city's drinking water. NEI work included a high resistance ground system, monitor control centers, variable frequency drives. PLC's with remote I/O's, UPS system and associated instrumentation.

 

Conveyer

Smithfield Beef, Green Bay, WI

Smithfield Beef decided to build a new distribution facility hoping to save labor cost and improve product safety. They used NEI for the complete electical with everything from emergency power, phone and date wiring, to entire site lighting and conveyer system power.

 

wbe logoabc logo