The West Corp. Generator Project consisted of installing a backup generator system and transfer switch. It included the use of a 550 ton crane to place a 14,000 lb. Cummins Generator, powered by an 8.9L straight 6 diesel engine. Six of our certified electricians completed the majority of the work on a cold 12 hour Saturday so that there was no loss of production for West. Along with the weekend work, there were also a few late nights during the week spent preparing the annunciator panel inside the building. At Northern Electric, Inc. we do what it takes to complete the work and reduce down time, while giving our customers the highest quality product that they deserve!